Jira 简明教程
JIRA - Workload Pie Chart
工作负载饼图显示一个饼图,其中显示了某个特定项目的全部问题。让我们了解如何在 JIRA 中使用它。
A workload pie chart displays a pie chart showing all the issues for a specific project. Let us understand how to use it in JIRA.
Generate a Report
为了生成一份报告,用户应遵循以下步骤。
To generate a report, the user should follow the steps given below.
Step 1 − 转至项目 → 选择特定项目。单击菜单左侧的报告图标。转至“其他”部分,并单击工作负载饼图报告,如下面的屏幕截图所示。
Step 1 − Go to Project → choose the Specific project. Click on the Report icon on the left side of the menu. Go to ‘Others’ section and click on Workload Pie Chart Report as shown in the following screenshot.

Step 2 − 选择要为其生成报告的项目或问题过滤器。在统计类型中,选择要根据其生成饼图的字段名称。选择要报告的时间字段,例如当前估计、原始估计或花费的时间。
Step 2 − Select Project or issue filter for which to generate the report. In the Statistic Type, select the field name on which the pie chart will be formed. Select the Time Field to report on as Current Estimate, Original Estimate or Time Spent.
以下屏幕截图显示了如何通过提供详细信息来生成报告。
The following screenshot shows how to generate a report by providing details.

Step 3 − 单击 Next 以生成报告。以下屏幕截图显示了生成报告的外观。
Step 3 − Click on Next to generate the report. The following screenshot shows how the generated report looks like.
